With the house, the insulation was installed but they are coming back this week to blow some in the attic some due to the numerous 'holes' created when they tacked up the blanket type above & below the wires, lights, and such. The plumbers set the whirlpool tub in the master bath. The windows have been finished off with brick molding (same that is around the exterior doors) before the stucco crew starts their work. The drywall guys are hired. So this coming week should see some changes.
This is the garage (looking towards the washer/dryer area) after the insulation was installed:

This is one of the windows so you can see how they look with the molding:

More carpentry work is being finished in the shop. The base boards are down, interior doors (swing and pockets) hung, and knobs & locks installed.
This is inside my studio, showing the base board down, door installed & framed but before the door knob/lock was installed.

0 Comments:
Post a Comment
<< Home